You are here: Startseite / Einrichtungen / Rathaus / Dienstleistungen
Procedure descriptions

Immission control - Submit measurement report on individual measurements of air pollutants at installations in accordance with the authorisation notice

If you operate or wish to operate certain industrial or commercial facilities that require a permit, the authorities may stipulate in the permit that you must have the pollutant emissions checked at regular intervals by means of individual measurements.

The measurements must be carried out by a notified body (measuring centre) in accordance with § 29b of the Federal Immission Control Act (BImSchG). You must draw up a measurement report on the results and submit it to the responsible immission control authority.

Responsible authority

The responsibilities in the area of immission control are regulated in the Immission Control Competence Ordinance of the state of Baden-Württemberg (ImSchZuVO).

In most cases, the competent authority for installations requiring authorisation under immission control legislation is the local lower immission control authority, i.e

  • the district office if the premises with the plant are located in a district,
  • the city administration if the premises with the installation are located in a city district.

A different responsibility applies in the following cases (e.g. for companies that are subject to the European Industrial Emissions Directive, the Hazardous Incident Ordinance or mining law):

Departments 5, Environment of the respective locally responsible regional councils are the competent immission control authorities for company premises on which

  • at least one installation that is labelled with the letter E in column d of Annex 1 of the Ordinance on Installations Requiring a Permit,
  • at least one operating area in accordance with Section 3 (5a) of the Federal Immission Control Act (hazardous incident operation),
  • at least one installation that requires a licence pursuant to Section 60 (3) sentence 1 no. 2 or no. 3 of the Federal Water Act, or
  • at least one landfill in accordance with Article 10 in conjunction with Annex I of Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control), as amended

exists or is to be constructed.

Department 9, State Office for Geology, Raw Materials and Mining of the Freiburg Regional Council is also the state-wide competent immission control authority for

  • Operational sites, including the facilities and activities located on them, which are subject to mining supervision,
  • Operating sites with cable cars and funicular railways used for passenger transport,
  • Operating sites with high-pressure gas pipelines which, as energy installations within the meaning of the Energy Industry Act, serve to supply gas and which are designed for a maximum permissible operating pressure of more than 16 bar,
  • Underground waste disposal facilities and
  • Sites with installations used for the construction, significant expansion and significant modification of underground cavities.

Details

Prerequisite

You have received a notice of approval for an industrial or commercial facility that requires authorisation.

Procedure

  • Individual measurements are specified by the authorities in the authorisation notice for your installation.
  • You contact a notified body (measuring centre) in accordance with Section 29b of the Federal Immission Control Act.
  • The exact measurement planning (measurement date, air pollutants to be measured, operating conditions of the installation to be taken into account, ...) must be agreed between you, the measuring centre and the responsible immission control authority.
  • The measuring centre determines the emission values on the measurement date.
  • Once the measurement has been completed, you will receive a measurement report from the measuring centre, which must be submitted to the responsible immission control authority.

Deadlines

  • Measurements must be carried out within the deadlines specified in the authorisation notice.
  • The associated measurement reports must be submitted to the competent authority within the deadlines specified in the approval notice.

Required documents

Complete measurement report in accordance with Annex A of Guideline VDI 4220 Sheet 2 (November 2018 edition) with information on, among other things

  • Measurement results,
  • measurement methods used,
  • Operating conditions that are important for the assessment of the measurement results.

Costs

None

Miscellaneous

Please ensure that you submit the measurement report to the immission control authority responsible for your installation.

Release note

Machine generated, based on the German release by: Umweltministerium Baden-Württemberg, 07.07.2025

Kontakt

Gemeindeverwaltung Ketsch
Hockenheimer Straße 5
68775 Ketsch

Telefon:
06202/606-0 (Zentrale)

Fax:
06202/606-116

E-Mail allgemein:
info-ketsch@ketsch.de

E-Mail Homepage:
redaktion-homepage@ketsch.de